We have reached the end of our journey, the last step, installation.
If you have been following this Blog Series, you have chosen to join us
on the educational mission of the proper installation of an amalgam
separator on a dry-vacuum system.
Step 1- Location- Part 1
of this Blog Series spoke about where in the mechanical room you will
locate the inlet pipe from chairs and determine the appropriate approach
to an installation based on its location.
Step 1– Location- Part 2
discussed where amalgam separators belong in the evacuation line
system, common mistakes made by Non-C.A.S.S. Service Technicians and
space-saving installation tips.
Step 2 – Hose illustrated the importance of choosing the right evacuation hose for your amalgam separator installation.
Step 3 – Fittings
offers tips on selecting the right parts to complete your LibertyBOSS
installation like an M.A.R.S Certified Amalgam Separator Specialist.
Step 4 – Planning reviewed simple tips on how to plan your installation to allow it to go as smoothly as possible.
Now we are ready for the fun part, the installation. We will be
offering pointers to make the installation of your LibertyBOSS easy and
fun.
http://www.marsbiomed.com/dry-vacuum-pump-step-5-installation/